Cloud Migration

Move to cloud with zero downtime, full security, and a bill that doesn't shock anyone.

NCompas delivers end-to-end cloud migration to Azure, AWS, and GCP — from the discovery assessment that maps every dependency, to the landing zone that makes it safe, to the FinOps governance that keeps it affordable after go-live.

$1.3Tannual cloud spend by enterprises globally by 2025 — cloud migration has moved from competitive advantage to survival infrastructure for every sector (Gartner, 2024).
94%of enterprises use cloud services — yet 80% report their migration took longer, cost more, or delivered less than projected. The difference is planning and governance, not technology.
40%average infrastructure cost reduction achieved by organisations that migrate and optimise simultaneously — not just lift-and-shift and hope.
faster time-to-market for new features at organisations that fully migrate to cloud-native architectures — the velocity compounding effect that makes migration an investment, not just a cost.

Why NCompas

Migrations that close on schedule — not six months and a budget overrun later.

Every cloud migration failure traces back to the same three causes: insufficient discovery, no landing zone before workloads, and no FinOps governance until the first bill arrives. We solve all three before we migrate anything.

Assessment Before Architecture

We never recommend a cloud target architecture before we've mapped your application estate, dependencies, and data flows. Every migration starts with discovery — because surprises mid-migration are the leading cause of blown budgets and missed timelines.

Zero-Downtime Cutover Design

Every production workload migration is designed for zero downtime — continuous replication, parallel run periods, and automated rollback procedures. We've never had to invoke a rollback, because we design so that the rollback is never needed.

Microsoft & AWS Certified Architects

Our architects hold Azure Solutions Architect Expert, AWS Solutions Architect Professional, and GCP Professional Cloud Architect certifications — not as background credentials, but as evidence of the depth we bring to every migration design.

FinOps Embedded from Day One

Cloud bills that shock CFOs are the result of migrations that never had cost governance designed in. We configure Reserved Instances, Savings Plans, rightsizing, and auto-scaling policies before the first workload goes live — so the bill on day one is the bill forever.

Security Never Traded for Speed

Landing zone, network segmentation, identity governance, and encryption in transit and at rest are configured before the first production workload migrates. Security baseline is a prerequisite, not a phase 2 follow-up.

Your Team Owns the Estate

Every migration engagement includes IaC in Terraform or Bicep so the infrastructure is version-controlled and repeatable, runbooks for every operational scenario, and hands-on knowledge transfer so your team manages the cloud estate independently after go-live.

The 6 Rs of cloud migration

Not every workload migrates the same way — and choosing wrong is expensive.

The migration strategy determines the cost, speed, risk, and long-term savings. We assess every workload against all six strategies and recommend based on your business constraints — not what's easiest for us to deliver.

Rehost"Lift & Shift"

Move workloads to the cloud with minimal changes — same architecture, new infrastructure. The fastest path to cloud for stable, non-critical workloads. Best for rapid data centre exits with a defined sunset date.

Data centre exit deadlinesLegacy ERP hostingFile & print serversDisaster recovery workloadsDev / test environments
Repurchase"Drop & Shop"

Replace existing on-prem software with a SaaS alternative — the most common path for CRM, HR, and collaboration workloads. Eliminates infrastructure responsibility entirely and shifts to OpEx.

On-prem CRM → SalesforceExchange → Microsoft 365On-prem HR → WorkdayOn-prem ERP → SAP BTPCustom LMS → Cornerstone
Refactor"Re-architect"

Redesign applications to fully exploit cloud-native capabilities — microservices, serverless, event-driven architectures, and managed AI services. The highest-effort, highest-reward migration strategy.

Monolith → microservicesBatch → event-drivenVM-based → serverlessCustom DB → DynamoDB / CosmosLegacy API → API Gateway
Retain"Don't migrate yet"

Deliberately keep some workloads on-premises — latency-sensitive systems, regulatory-constrained data, recent capital expenditure, or systems mid-development. A hybrid cloud is a valid architecture, not a compromise.

Regulatory data residencyUltra-low-latency workloadsRecent hardware investmentSystems in active developmentHigh-bandwidth data processing
Retire"Switch off"

Identify and decommission applications that are no longer needed — the most underused migration strategy. Typical discovery finds 10–20% of an estate eligible for retirement, delivering immediate cost savings before a single workload is migrated.

Duplicate applicationsLegacy reporting tools replaced by BIShadow IT systemsEOL applications with no usersSuperseded batch jobs

Six core capabilities

End-to-end migration — assessment to decommission, nothing left out.

Cloud migration is not a single service — it's six interconnected capabilities. Every NCompas migration engagement covers all six, with no gaps that become problems six months after go-live.

Cloud Assessment & Migration Readiness

A structured discovery that gives you a complete view of your application estate, infrastructure dependencies, total cost of ownership, and recommended migration strategy per workload — before you spend a pound on cloud.

Application portfolio discoveryDependency mappingTCO vs cloud cost modellingRisk stratification per workloadMigration wave planningBusiness case & ROI model
Migration projects with a formal assessment complete 60% faster with 40% fewer surprises than undiscovered migrations

AWS Migration & Cloud-Native

AWS migration using AWS Application Migration Service (MGN), AWS Database Migration Service, and the AWS Well-Architected Framework. Workloads migrated with validated security controls, cost-optimised instance selection, and Savings Plans from day one.

AWS Application Migration ServiceAWS Database Migration ServiceEC2 right-sizing & Reserved InstancesAWS Savings PlansAWS Well-Architected ReviewAWS Control Tower landing zone
Average 52-week TCO reduction of 44% for brownfield estates migrated to AWS with simultaneous right-sizing

Database & Data Migration

Complex database migrations — Oracle, SQL Server, MySQL, PostgreSQL — to cloud-managed databases with schema conversion, data validation, and minimal downtime using continuous replication during cutover.

Oracle → Azure SQL / RDSSQL Server → Azure SQL MITeradata → Snowflake / SynapseMySQL / PostgreSQL → RDSMongoDB → Cosmos DBSchema conversion & validation
Database migrations with continuous replication achieve cutovers of under 4 hours with zero data loss

Landing Zone & Cloud Governance

Design and deploy a production-ready multi-account cloud landing zone — network topology, identity federation, security baselines, policy guardrails, and cost governance — before migrating a single workload. The foundation that makes everything else safe.

Azure Landing Zone / CAFAWS Control Tower & OrganizationsNetwork hub & spoke topologyAzure AD / Entra ID federationPolicy-as-code (Azure Policy / SCPs)FinOps tagging taxonomy
Organisations with a landing zone in place before migration experience 70% fewer security incidents during the migration programme

FinOps & Cloud Cost Optimisation

Cloud migration without cost governance is just moving your problem. We embed FinOps practices from day one — Reserved Instance and Savings Plan purchasing, rightsizing, auto-scaling policies, storage lifecycle rules, and monthly cost reviews.

Reserved Instance & Savings PlansRightsizing & instance family selectionAuto-scaling policy designStorage lifecycle & tieringCost anomaly alertingMonthly FinOps reviews
FinOps-governed cloud environments average 32% lower run cost vs. ungoverned lift-and-shift at 12 months post-migration

Platforms & tools we deploy

Cloud PlatformMicrosoft Azure
Cloud PlatformAmazon Web Services
Cloud PlatformGoogle Cloud
Migration ToolAzure Migrate
Migration ToolAWS MGN / DMS
DR / MigrationAzure Site Recovery
Infrastructure as CodeTerraform / Bicep
Hybrid CloudAzure Arc
GovernanceAWS Control Tower
IdentityAzure AD / Entra ID
DiscoveryCloudamize / Movere
FinOpsAzure Cost Management

How we work

First workload in cloud in eight weeks — full estate migrated in sixteen.

Six phases from discovery to decommission. Every milestone has defined acceptance criteria. Nothing moves to the next phase until the current one passes validation.

01

Discovery & Estate Mapping

Automated and manual discovery of every application, server, database, and network dependency. Output: a complete application portfolio with risk ratings, dependency graphs, and decommission candidates identified before we design anything.

02

Cloud Strategy & Business Case

Target cloud platform selection (Azure, AWS, GCP, or hybrid), migration strategy per workload (the 6 Rs), wave sequencing plan, TCO vs. cloud cost model, and a board-ready business case with payback period and 5-year NPV.

03

Landing Zone & Security Baseline

Production-ready cloud foundation deployed before migration begins — multi-account structure, network topology, identity federation, security controls, and FinOps governance. The landing zone is the foundation everything runs on.

04

Wave-Based Migration Execution

Phased migration in waves starting with lowest-risk workloads. Each wave: pre-migration validation, replication setup, parallel run, cutover, and hypercare period. Lessons from each wave applied to the next.

05

Validation & Performance Optimisation

Post-migration validation against defined acceptance criteria — performance, availability, data integrity, security posture. Instance rightsizing, Reserved Instance purchasing, and auto-scaling policy tuning. Cloud-native feature adoption where viable.

06

Decommission & Handover

On-premises infrastructure decommissioned and contracts cancelled in sequence with cloud go-live. Full documentation, runbooks, monitoring configuration, and team enablement. 90-day hypercare with on-call support.

Migration results

From data centre to cloud — on time, on budget, zero incidents.

Four industries, four migrations. Every outcome metric is from a completed production migration — not a projected business case.

The Challenge

Regional bank with 3 ageing data centres, £2.4M/year maintenance contracts expiring, and a board mandate to exit physical infrastructure within 18 months. 180 applications, 60% undocumented. Complex regulatory requirements around data residency and audit trails.

What We Delivered

12-week discovery and dependency mapping of all 180 applications, producing a risk-stratified migration plan across 8 waves. Azure Landing Zone deployed in week 8. 60% of applications rehosted, 30% replatformed to Azure PaaS, 10% retired. Zero-downtime cutover for all production systems.

18 monthsfull data centre exit, on schedule
£1.8M/yrinfrastructure cost saving post-migration
10%of applications retired (immediate savings)
Financial Services

Regional bank with 3 ageing data centres, £2.4M/year maintenance contracts expiring, and a board mandate to exit physical infrastructure within 18 months. 180 applications, 60% undocumented. Complex regulatory requirements around data residency and audit trails.

18 monthsfull data centre exit, on schedule
£1.8M/yrinfrastructure cost saving post-migration
10%of applications retired (immediate savings)
Healthcare & NHS

NHS Trust with on-premises clinical systems, 400TB of patient data, DSPT compliance obligations, and a mandate to move to N3/HSCN-connected cloud. Zero tolerance for downtime on clinical systems. Previous migration attempt abandoned after 6 months due to complexity.

400TBpatient data migrated with zero data loss
< 15 minRTO for all clinical systems post-migration
100%DSPT & Cyber Essentials Plus compliance maintained
Manufacturing & Distribution

Global manufacturer with 12 factories across 8 countries, each running a local ERP instance on physical servers. No centralised identity or security controls. 15 on-prem SQL Server databases, 3 approaching end of support. OT/IT convergence required for Industry 4.0 roadmap.

12 factorieson unified Azure cloud estate
44%infrastructure cost reduction year one
10 weekspilot factory fully migrated and operational
Retail & E-Commerce

E-commerce platform on ageing on-prem infrastructure unable to handle peak trading. Black Friday causing 6-8 hour outages two years running. Elasticity impossible on fixed hardware. Monolithic .NET application with 400,000 lines of code.

0 hoursBlack Friday downtime (vs. 7.5 hrs previous year)
50×peak load handled with auto-scaling (vs. fixed capacity)
35%infrastructure cost reduction at steady-state load

Why cloud migrations fail — and how to make yours the exception.

73%

of cloud migrations exceed their original budget — almost entirely due to insufficient discovery, missing dependency maps, and no FinOps governance before the first workload migrates.

38%

average cost reduction when organisations optimise simultaneously with migration — organisations that lift-and-shift first and optimise later save only 8–12% in year one.

2026

the year Gartner projects 85% of enterprise infrastructure will be cloud-hosted — organisations still planning migration in 2025 are entering the final window before competitors have a permanent velocity advantage.

60%

faster new feature delivery for organisations that complete cloud migration and adopt cloud-native services vs. those still managing on-premises infrastructure — the compounding innovation advantage.

Expert Insights for Smarter Digital Innovation

Insights from real-world engineering, cloud, and AI leaders - helping you make better decisions, faster.

Find out exactly what it would take to migrate your estate — with no surprises.

Start with a free Cloud Migration Readiness Assessment — we'll map your application estate, identify dependencies and risks, model the cloud cost vs. on-prem TCO, and give you a wave plan and timeline you can take to your board.